
Not too big, not too small. The Missing Middle, implemented beautifully.
Two buildings, twelve apartments each. Indoor bike storage, solar and EV-ready. Completed 2023.
Project Site
Marshall Avenue, just east of Snelling Avenue
Saint Paul, MN
Walkable amenities:
3 minute walk to Starbucks
4 minute walk to bus lines
5 minute walk to Whole Foods
11 minute walk to Allianz Field soccer stadium
15 minute walk to Bus Rapid Transit and Light Rail
Virtual tour through our model 1BR apartment
Huge windows and lots of light
A strong street presence. Each building is three stories tall with four one-bedroom apartments per floor.
Project Team
Architect:
Locus Architecture
Locus has been designing homes with leading-edge sustainability features in the Twin Cities for over 20 years. Their design innovations on this project caught the city’s interest and contributed to our team’s selection.
Contractor:
Stahl Construction
Founded in 1981 by owner and CEO Wayne Stahl, Stahl Construction is a mid-size, full-service company. With a workload of just 8–10 carefully selected projects at any one time, Stahl can devote the time and effort necessary to add value and make a positive difference each project.