Not too big, not too small. The Missing Middle, implemented beautifully.
Two buildings, twelve apartments each. Indoor bike storage, solar and EV-ready. Completed 2023.
Project Site
Marshall Avenue, just east of Snelling Avenue
Saint Paul, MN
Walkable amenities:
3 minute walk to Starbucks
4 minute walk to bus lines
5 minute walk to Whole Foods
11 minute walk to Allianz Field soccer stadium
15 minute walk to Bus Rapid Transit and Light Rail
A strong street presence. Each building is three stories tall with four one-bedroom apartments per floor.
Project Team
Architect:
Locus Architecture
Locus has been designing homes with leading-edge sustainability features in the Twin Cities for over 20 years. Their design innovations on this project caught the city’s interest and contributed to our team’s selection.
Contractor:
Stahl Construction
Founded in 1981 by owner and CEO Wayne Stahl, Stahl Construction is a mid-size, full-service company. With a workload of just 8–10 carefully selected projects at any one time, Stahl can devote the time and effort necessary to add value and make a positive difference each project.